Statistics for PT
z′, ζ and En scores: PT scores that use uncertainty
The z-score judges a result against the spread a scheme considers acceptable. Three other scores bring uncertainty into the picture: z′ allows for an uncertain assigned value, ζ tests a result against the uncertainties claimed for it, and En does the same with expanded uncertainties. This guide works through each one and shows how to read them together.
- Byline
- By the EqasOnline team
- Last reviewed
- Reading time
- 8 min read
On this page
- Three scores, three questions
- Standard and expanded uncertainty
- z′: when the assigned value is uncertain
- ζ: does the difference fit the stated uncertainties?
- En: the score for calibration comparisons
- Percent difference and fixed limits
- Which score suits which scheme
- Reading z and ζ together
- The limits of ζ and En
Three scores, three questions
The z-score asks one question: is the result within what the scheme considers fit for purpose? The three scores below each ask something slightly different.
| Score | Formula | Uncertainties used | Satisfactory |
|---|---|---|---|
| z′ | (x − xpt) / √(σpt2 + u2(xpt)) | Standard: u(xpt) only | 2.0 or less in size |
| ζ | (x − xpt) / √(u2(x) + u2(xpt)) | Standard: u(x) and u(xpt) | 2.0 or less in size |
| En | (x − xpt) / √(U2(x) + U2(xpt)) | Expanded: U(x) and U(xpt) | 1.0 or less in size |
z′ and ζ use the z limits: questionable above 2.0, unsatisfactory at 3.0 or more. En has a single limit of 1.0.
Standard and expanded uncertainty
A standard uncertainty, u, is expressed as a standard deviation. An expanded uncertainty, U, is the standard uncertainty multiplied by a coverage factor, k:
U = k × u, so u = U / k
With k = 2, U gives an interval expected to hold about 95 % of the values that could reasonably be attributed to the measurand, assuming a roughly normal distribution. Most certificates and reports use k = 2 and say so.
Example: three conversions
- A reference material certificate gives 12.40 ± 0.30 mg/kg (k = 2). The standard uncertainty is u = 0.30 / 2 = 0.15 mg/kg.
- A laboratory states a relative expanded uncertainty of 8 % (k = 2) on a result of 45.0 µg/L. U = 0.08 × 45.0 = 3.6 µg/L, so u = 3.6 / 2 = 1.8 µg/L.
- A calibration certificate states U = 0.113 °C with k = 2.26, because the estimate rests on few degrees of freedom. u = 0.113 / 2.26 = 0.050 °C.
Warning: read k before you divide
Divide by the coverage factor the document states, not by 2 out of habit. If a value is given as “±” with no k and no coverage probability, you cannot tell whether it is u or U. Ask before you use it.
z′: when the assigned value is uncertain
The assigned value is an estimate, so it has a standard uncertainty, u(xpt). ISO 13528 treats it as negligible when it is no more than 0.3 σpt. Above that, a provider can add it to the denominator, so that participants are not penalised for the uncertainty of the assigned value:
z′ = (x − xpt) / √(σpt2 + u2(xpt))
z′ is still a fitness-for-purpose score. σpt dominates the denominator, and the participant’s own uncertainty plays no part.
Example: PFOS in groundwater
A small round: xpt = 24.0 ng/L is the robust mean of nine results with a robust standard deviation of 4.8 ng/L, so u(xpt) = 1.25 × 4.8 / √9 = 2.0 ng/L. σpt = 4.8 ng/L, which is 20 % of xpt. Since 2.0 is more than 0.3 × 4.8 = 1.44, u(xpt) is not negligible. A participant reports 33.8 ng/L.
- z = (33.8 − 24.0) / 4.8 = 9.8 / 4.8 = +2.04: questionable.
- z′ = 9.8 / √(4.8² + 2.0²) = 9.8 / √27.04 = 9.8 / 5.2 = +1.88: satisfactory.
For the same result, z′ is always a little smaller in size than z and has the same sign, so it can only move a result towards satisfactory. That protects participants, but it also loosens the criterion. A better assigned value, from more results, a reference laboratory or a reference material with a certificate, is the better fix. How the assigned value is set covers the options.
ζ: does the difference fit the stated uncertainties?
ζ = (x − xpt) / √(u2(x) + u2(xpt))
The denominator is the standard uncertainty of the difference between the result and the assigned value, when the two are independent. A satisfactory ζ means the result agrees with xpt within the uncertainties that the laboratory and the provider claim. An unsatisfactory ζ means the difference is too large for those claims: there is an error, or the laboratory’s uncertainty is underestimated, or both. ζ contains no σpt, so on its own it says nothing about fitness for purpose.
Example: copper in a pig feed
xpt = 160 mg/kg with u(xpt) = 6 mg/kg. A laboratory reports 187 mg/kg and states U(x) = 16 mg/kg (k = 2).
- Convert first: u(x) = 16 / 2 = 8 mg/kg.
- ζ = (187 − 160) / √(8² + 6²) = 27 / √100 = 27 / 10 = +2.7: questionable.
- Forgetting to convert gives 27 / √(16² + 6²) = 27 / 17.1 = +1.58, which looks satisfactory. It is not.
En: the score for calibration comparisons
En = (x − xpt) / √(U2(x) + U2(xpt))
En is the usual score in calibration comparisons, where the assigned value normally comes from a reference laboratory and every party states an expanded uncertainty. A size of 1.0 or less is satisfactory and anything above 1.0 is unsatisfactory. Conventionally there is no questionable band.
Example: a travelling thermometer
Each laboratory reports the error of a digital thermometer at 120 °C. The reference laboratory finds 0.240 °C with U = 0.030 °C (k = 2). A participant finds 0.280 °C with U = 0.040 °C (k = 2).
En = (0.280 − 0.240) / √(0.040² + 0.030²) = 0.040 / 0.050 = 0.80: satisfactory.
Why the limit is 1 and not 2
U already contains the factor k = 2. When both parties use k = 2, En is exactly half of ζ. In the thermometer example the standard uncertainties are 0.020 °C and 0.015 °C, so ζ = 0.040 / √(0.020² + 0.015²) = 0.040 / 0.025 = 1.6, and En = 0.80. A limit of 1.0 for En therefore sits where ζ reaches 2.0. The difference is that En has no warning band: what ζ would call questionable, En calls unsatisfactory.
Warning: mixing the two kinds of uncertainty
Put standard uncertainties into En and the denominator halves: the thermometer would score 0.040 / 0.025 = 1.6, wrongly unsatisfactory. Put expanded uncertainties into ζ and the score halves, so a poor result looks good. Convert first, every time.
Percent difference and fixed limits
Some schemes leave σpt out altogether and judge the percent difference, D% = 100 × (x − xpt) / xpt, against a fixed limit set before the round. The limit comes from what the results are used for, such as a clinical performance specification or a regulatory requirement, and there is usually no warning band.
Example: total phosphorus against a ±10 % limit
xpt = 2.40 mg/L. A result of 2.62 mg/L gives D% = 100 × 0.22 / 2.40 = +9.2 %, which is acceptable. A result of 2.68 mg/L gives 100 × 0.28 / 2.40 = +11.7 %, which is not.
A percentage limit shrinks as xpt falls, until no method can meet it. A common answer is to accept the larger of an absolute and a relative limit, for example ±0.05 mg/L or ±10 %, whichever is larger. If σpt is a fixed percentage of xpt, the two scores convert directly: z is D% divided by σpt as a percentage. A fixed limit and the z bands can then disagree near their edges, and the scheme plan says which one counts.
Which score suits which scheme
| Scheme | Usual score | What it asks |
|---|---|---|
| Testing schemes with σpt set for fitness for purpose | z | Is the result good enough for its purpose? |
| The same, when u(xpt) is more than 0.3 σpt | z′ | The same, allowing for an uncertain xpt |
| Schemes where participants report uncertainties | ζ, alongside z | Does the difference fit the stated uncertainties? |
| Calibration comparisons against a reference laboratory | En | Do the results agree within their expanded uncertainties? |
| Schemes with a fixed performance specification | D% against a fixed limit | Is the error within the specification? |
| Identifications, detection and grades | An expected answer | Is the answer right, or how far off is it? |
Reading z and ζ together
z compares the error with σpt, a yardstick set for fitness for purpose. ζ compares the same error with the uncertainties that the laboratory and the provider claim. Together they sort results into four cases.
| ζ satisfactory | ζ unsatisfactory | |
|---|---|---|
| z satisfactory | Fit for purpose, with a realistic uncertainty | Fit for purpose, but the stated uncertainty is too small |
| z questionable or worse | The uncertainty covers the error, but the result is not fit for purpose | A real problem: investigate |
Example: mercury in fish, two laboratories
xpt = 0.500 mg/kg, u(xpt) = 0.010 mg/kg and σpt = 0.075 mg/kg.
| Laboratory | Result (mg/kg) | U(x), k = 2 | z | ζ |
|---|---|---|---|---|
| A | 0.560 | 0.030 | +0.8 | +3.3 |
| B | 0.710 | 0.300 | +2.8 | +1.4 |
Laboratory A: z = 0.060 / 0.075 = +0.8, but ζ = 0.060 / √(0.015² + 0.010²) = 0.060 / 0.018 = +3.3. The result is fine; an expanded uncertainty of about 5 % is too small for this test, so the uncertainty estimate needs review.
Laboratory B: z = 0.210 / 0.075 = +2.8, questionable, while ζ = 0.210 / √(0.150² + 0.010²) = 0.210 / 0.150 = +1.4. The stated uncertainty covers the error, but an expanded uncertainty of about 42 % of the result is not fit for purpose.
The limits of ζ and En
ζ and En reward realistic uncertainties, but both can be passed by overstating them. Had the thermometer laboratory claimed U = 0.20 °C, it would have scored En = 0.040 / √(0.20² + 0.030²) = 0.040 / 0.202 = 0.20. It passes more easily, but a calibration with five times the uncertainty may be no use to its customers.
- No fitness for purpose. Neither score contains σpt or any statement of what users need. A pass says the result is consistent with its claim, not that the claim is good enough.
- A claim is only as honest as its source. In calibration, compare the stated uncertainty with the laboratory’s published calibration and measurement capability. A smaller figure is not credible, and a much larger one tests nothing the laboratory claims.
- Independence. With a consensus xpt, the participant’s own result helped form the assigned value, so the two are not fully independent. The effect is small when there are many participants.
The remedy is simple. Report the uncertainty you would give a customer for the same work, no larger and no smaller, state the coverage factor, and read ζ or En next to a fitness-for-purpose score whenever the scheme gives one.
Take the free lesson
Module 4 · Performance scores
Five lessons and a practice case: the z score and its bands, what the bands mean statistically, the scores that bring uncertainties in, percent difference and qualitative results, and choosing a score, ending with one result scored four ways. The course is free in the EqasOnline Academy; lessons open after you create a free account.
Take the free lessonScoring PT rounds?
In EqasOnline one server-side engine scores every round the same way, following ISO 13528 methods. Every result gets a z-score and a % bias, the uncertainty of the assigned value is checked against 0.3 σpt, and z′ is shown beside z in the provider’s review matrix and the parameter-wise report.