Running a PT scheme
Running a proficiency testing scheme: the plan, the round and the report
A proficiency testing round involves many decisions: what to send, to whom, how to check it, how to score it and when to report. ISO/IEC 17043 expects a provider to make and document them before the round runs. This guide walks through the scheme plan, the round itself and the participant report, in the order a provider meets them.
- Byline
- By the EqasOnline team
- Last reviewed
- Reading time
- 10 min read
On this page
- Start with the scheme plan
- Choosing the levels and the matrix
- Fix the evaluation before the results arrive
- A round from plan to report
- Instructions to participants
- Closing dates and late results
- Confidentiality and participant codes
- Deterring and detecting collusion
- What the participant report contains
- After the report
Start with the scheme plan
The document that records a provider’s decisions is the scheme plan; some providers call it the scheme protocol or design. It has two readers. Inside the provider, it tells the people who prepare items, run the statistics and sign the report what to do. Outside, it is the rulebook: a participant can see in advance how its results will be judged, and an assessor can check afterwards that the provider kept to it.
| Topic | What the plan settles | Example |
|---|---|---|
| Purpose and participants | What the scheme is for, who may enrol, how many are expected | Mycotoxins in cereals for food testing laboratories; about 60 participants |
| Measurands | What is measured, the unit and the decimals to report | Deoxynivalenol in µg/kg, whole numbers |
| Items and levels | Matrix, number of levels, the range covered | Two naturally contaminated wheat flours per round |
| Homogeneity and stability | Which checks, which method, which criteria | The ISO 13528 Annex B checks |
| Assigned value | How xpt is set and how its uncertainty is estimated | Robust mean of participants’ results |
| σpt | How it is set | A fixed percentage of xpt, chosen from what the results are needed for |
| Scoring | Which score, which limits, the rounding rule | z, with a size of 2.0 or less satisfactory |
| Timetable | Dispatch, closing date, report date | Closing date 21 days after dispatch |
| Reporting | What each participant receives, and when | An individual report within 21 days of the close |
| Confidentiality | Codes, who sees identities, what is published | Random codes; the key held by named staff |
| Contingencies | Lost or damaged items, too few results, failed checks | Fewer than 12 results: report for information, no scores |
Three of those rows have guides of their own: homogeneity and stability testing, the assigned value and choosing σpt.
Choosing the levels and the matrix
A level is the concentration, or value, of the measurand in an item. Good choices follow the laboratories’ real work.
- Cover the range in use, not one convenient concentration.
- Sit near decision points: a legal limit, a clinical cut-off, a product specification. An error matters most where it changes a decision.
- Include the low end if laboratories report results near their limit of quantification, and a negative or blank item where false positives matter.
- Send two or more levels so that constant and proportional errors can be told apart later.
Example: HbA1c
Laboratories use 48 mmol/mol as a diagnostic cut-off and see patients from about 30 to 120 mmol/mol. A scheme that always sends one level near 95 mmol/mol says little about performance at 48, where a small bias changes a diagnosis. Levels near 40, 50 and 80 mmol/mol across the year cover the cut-off and the range.
The item matrix should resemble routine samples: a real soil rather than spiked sand, a milk powder rather than a solution of the analyte, serum rather than buffer. A matrix that is too clean skips steps the laboratory normally performs, such as extraction, digestion or clean-up, so the round tests less than it seems to.
In clinical schemes it also matters whether the item is commutable: whether different methods respond to it the way they respond to patient samples. Freeze-drying, stabilisers and spiking can break this. On an item that is not commutable, method groups can disagree even though they agree on patients, so scoring every method against one reference value would blame laboratories for a property of the material. The plan says whether this has been checked and, if not, whether results are scored within method groups.
Fix the evaluation before the results arrive
The plan fixes how xpt and σpt will be set, which score and limits apply, how outliers are handled, and what happens when something goes wrong. The numbers, such as this round’s robust mean, are calculated after the close, but the method that produces them does not change once results are seen. If the method could be chosen afterwards, almost any outcome could be produced, and scores would mean something different in every round.
Example: a yardstick changed too late
A wastewater scheme fixes σpt for ammonium at 0.15 mg/L. In one round the results spread widely, with a robust standard deviation of 0.32 mg/L. A laboratory 0.50 mg/L above xpt scores 0.50 / 0.15 = +3.3, unsatisfactory. Rescored with 0.32 mg/L it would be 0.50 / 0.32 = +1.6, satisfactory. The laboratory did nothing differently; only the yardstick moved.
If a plan proves unsuitable, the provider changes it for future rounds, tells participants before those rounds, and records why. Within the current round, anything unexpected is handled by the contingency rules already in the plan and stated in the report.
A round from plan to report
| When | Step |
|---|---|
| Week −16 | Plan approved; participants enrol |
| Week −10 | Items prepared and packaged |
| Weeks −6 to −2 | Homogeneity check on packaged items; dispatch only after it passes |
| Week 0 | Dispatch with instructions and the closing date |
| Weeks 0 to 3 | Participants test the items as routine samples |
| Week 3 | Closing date; stability items measured |
| Weeks 4 to 5 | Evaluation by the planned method |
| Week 6 | Reports issued; laboratories review their results |
Instructions to participants
The provider gives participants detailed instructions with the items. Good instructions answer every practical question before anyone has to ask it.
| Topic | What to say | Why |
|---|---|---|
| On receipt | Check the packaging and item, record the arrival date and temperature, and contact the provider before testing if anything is wrong | A damaged item can be replaced instead of scored |
| Storage | Temperature and the longest time before testing | Stability was shown only under these conditions |
| Preparation | Reconstitution volume and diluent, standing time, mixing | A wrong volume shifts every result |
| Testing | Treat the item as a routine sample | The round should test routine work |
| Reporting | Unit, decimals, method or instrument code, how to report results under a reporting limit | Results must be comparable and correctly grouped |
| Closing date | Date, time and time zone, and how to submit | One cut-off for everyone |
| Safety | Hazards of the material | Staff handle it safely |
Example: one missing phrase
A drinking-water scheme asks for nitrate “in mg/L” without saying whether as nitrate or as nitrogen. The same item comes back as 44.3 from some laboratories and 10.0 from others, a factor of 4.43 (62.0 / 14.0). Neither group made an analytical error, yet whichever group is smaller looks unsatisfactory against the consensus. One phrase in the instructions, “as NO₃⁻”, would have prevented it.
Closing dates and late results
The scheme plan fixes the closing date and says what happens to late results. Common rules are that late results are not scored, or that they are evaluated for information only, clearly marked, and never used to calculate xpt.
At the close, the data set is frozen. The provider analyses the results it holds, using the method in the plan, and nothing changes afterwards: no late additions, no corrections to submitted results unless the plan allows for them, no re-running with a different data set. Once xpt or the report is out, a late or corrected result could simply be tuned to it.
The same rule applies to everyone. If the provider knows of a delivery problem before the close, it can extend the closing date for every participant affected, announced in advance. A laboratory that finds its own error after the close keeps the submitted result in the report, and records and investigates the error itself.
Confidentiality and participant codes
- Each participant is known by a code. The key that links codes to laboratories is held by the few staff who need it to run the scheme.
- Codes are allocated at random, not in order of enrolment. Some schemes issue a new code each round; where codes are permanent, the key needs tighter control.
- Never published: a laboratory’s name next to its results, or anything that identifies it indirectly, such as a method group of one.
- Disclosure to a regulator or accreditation body happens only with the participant’s agreement, where the law requires it, or where the scheme’s terms, made known to participants in advance, provide for it. The participant is told what was released.
Deterring and detecting collusion
Collusion is participants comparing or sharing results before the close. Falsification is reporting a result that was not obtained by testing the item as a routine sample: copied, invented, or nudged towards an expected value. Either way the score stops saying anything about the laboratory, and copied results can distort a consensus xpt for everyone else. Providers are expected to take measures against both.
- Different items or levels for participants likely to be in contact: the same city, the same hospital group, the same owner. Allocate at random and keep the allocation confidential.
- Release nothing before the close: no assigned values, expected ranges, summary statistics or early reports.
- Random codes, so participants cannot find one another in a report.
- Do not reuse a material whose value has been published, unless enough time has passed and nothing links it to the earlier round.
- Clear terms that say what happens when collusion or falsification is found.
No single pattern proves anything, but some deserve a closer look: identical results across several measurands, especially to more decimals than the method supports; identical errors, such as the same unit slip or the same swapped digits; a result that matches a level the participant did not receive; and two participants whose results track each other, round after round, far more closely than anyone else’s.
Example: the wrong level
In a round for copper in sediment, level A (xpt = 48.6 mg/kg) and level B (xpt = 31.2 mg/kg) are allocated at random, with σpt = 2.5 mg/kg for level B. One participant received level B but reports 48.9 mg/kg: z = (48.9 − 31.2) / 2.5 = +7.1 against its own item, yet within 0.3 mg/kg of level A, which went to another participant in the same city. The provider first checks its own dispatch and labelling records, because a label mix-up would be its own error, then follows its documented procedure for suspected collusion.
What the participant report contains
ISO/IEC 17043 lists what a PT report includes, unless the provider documents a reason to leave something out. Paraphrased and grouped:
| Group | Contents |
|---|---|
| Identity | Provider and contact details; scheme and round; report number, issue date and status, for example final or amended; page numbers and a clear end |
| The participant | Its code, the items it received, and its results as reported |
| The items | What they were and how they were prepared; the homogeneity and stability outcomes |
| The evaluation | xpt, how it was set, its uncertainty and its traceability; σpt and how it was set; the scores and their criteria; the number of participants and results used; summary statistics and graphics |
| Interpretation | Comments on performance and advice on reading the statistics |
| Authorisation | Name and role of the person who authorised the report; any subcontracted activities; a confidentiality statement |
A complete report lets a laboratory recalculate its own score, judge how reliable xpt is, and show an assessor exactly what was evaluated. How to read a PT report is the participant’s side of the same list.
After the report
A round does not end when the report is issued. Participants may question an evaluation, and a provider is expected to have a documented process for receiving, investigating and deciding on complaints and appeals, to keep the participant informed, and to tell it the outcome. If an evaluation was wrong, the provider issues a corrected report, marked as amended, and keeps the earlier version on record.
What remains is the record: who enrolled, what was sent and when, whether the items passed their checks, which results arrived, how they were scored, and which report version each participant received. Most of the work in a round is keeping that record as the round runs, not rebuilding it before an assessment. For the wider picture of what PT is and what the standards ask, see proficiency testing: the complete guide.
Take the free lesson
Module 2 · Inside a PT round
Five lessons and a practice case: the scheme plan, homogeneity with an interactive calculator, stability and transport, running the round, and collusion and the participant report. The course is free in the EqasOnline Academy; lessons open after you create a free account.
Take the free lessonRun a PT scheme?
EqasOnline lets PT and EQA providers run their schemes end to end (rounds, test items, results, ISO 13528 statistics, reports and certificates) in one system, with the evidence kept as the round runs. Rounds sit on one calendar with deadlines in your time zone, reminders go out three days and one day before the deadline, participants appear as codes in your screens, and reports go out on your release date.