Reports and follow-up
Investigating an unsatisfactory PT result: root cause and corrective action
An unsatisfactory proficiency testing score is strong evidence that something went wrong, and accreditation standards expect it to be handled as a nonconformity. This guide follows an investigation from the day the report arrives: what to check first, how to reach a root cause, how to decide whether routine results were affected, and how to show the corrective action worked.
- Byline
- By the EqasOnline team
- Last reviewed
- Reading time
- 12 min read
On this page
- An unsatisfactory score is a nonconformity
- Size the response to the signal
- Investigate before you correct
- Check the clerical trail first
- Six places a cause can lie
- Retesting retained material
- Records for the test date
- Finding the root cause
- Does the suspected cause explain the score?
- Correction and corrective action
- Impact on results already reported
- Checking that the fix worked
- Writing the record
- When the cause may be the item or the evaluation
An unsatisfactory score is a nonconformity
A laboratory with no real problem scores 3.0 or more in size only about 3 times in 1,000. So an unsatisfactory score is strong evidence that something went wrong, and it is treated as a nonconformity: recorded, investigated, corrected and checked.
- ISO/IEC 17025:2017 asks laboratories to analyse monitoring data such as PT results and to act when they fall outside predefined criteria (7.7.3), through the corrective action process (8.7).
- ISO 15189:2022 asks the same of EQA results (7.3.7.3), with nonconformities and corrective actions in 8.7.
- If routine results may have been affected too, it is also nonconforming work (ISO/IEC 17025 7.10, ISO 15189 7.5).
Open the record the day the report arrives: the round, item, measurand, your result, the score and who owns the investigation.
Size the response to the signal
| Signal | Chance with no real problem | Response |
|---|---|---|
| One questionable score | About 1 in 20 | A short review, a record, and a watch on the next rounds |
| Questionable twice running, same measurand | About 1 in 500 | Investigate |
| A run, drift or step across rounds | Small, and shrinking with each round | Investigate, even if every score is satisfactory |
| Unsatisfactory | About 3 in 1,000 | A full investigation |
Chance adds up across measurands. A laboratory reporting 25 measurands in three rounds a year produces 75 scores, so it should expect three or four questionable scores a year with every method working well. Investigating each one in full wastes effort; ignoring them all throws away early warnings. Lower the threshold where the risk is higher, for example a full investigation of any questionable score on a measurand that drives urgent decisions. z-scores in proficiency testing explains the chance figures.
Investigate before you correct
The instinct is to fix something at once: recalibrate, open a new reagent lot, adjust the method. A change made before you know the cause can destroy the evidence, because the system you need to examine no longer exists. It can hide the cause, so it comes back later. It can add a new error, if the change itself goes wrong. And it wastes effort if the real cause was a typing slip.
Protecting current results is a different job. If the method is reporting routine results today, judge the risk and, if there is real doubt, hold or repeat reports while you investigate. That is containment, not correction.
Check the clerical trail first
Clerical causes are common, and they can be ruled in or out without touching the analyser.
| Check | Compare | Typical slip |
|---|---|---|
| Transcription | Instrument printout, laboratory records and the submitted form | Digits swapped, decimal point moved |
| Units and basis | The unit the scheme asked for and the one you used | µg/L entered as mg/L; nitrate reported as nitrate-N |
| Item identity | Which item went into which position or field | Items A and B swapped |
| Calculation | Dilution factors, conversions, rounding | A factor left out or applied twice |
| Method code | The method you used and the code you submitted | Scored in the wrong peer group |
| What was scored | The result recovered from the report: xpt + z × σpt | The provider scored a value you did not send |
Example: lead in soil, two items
Item A has xpt = 120 mg/kg and σpt = 12 mg/kg. Item B has xpt = 85 mg/kg and σpt = 8.5 mg/kg. The laboratory reported 86 for A and 118 for B, so z = (86 − 120) / 12 = −2.8 for A and (118 − 85) / 8.5 = +3.9 for B.
The signs are opposite, and each result sits close to the other item’s assigned value. Entered the right way round, 118 for A gives z = −0.2 and 86 for B gives z = +0.1. The analysis was fine; the results were swapped.
A clerical cause still counts. The provider scores what was submitted, so the score stands. And a reporting step that let one slip through can let another through on a customer’s report, so it needs its own corrective action.
Six places a cause can lie
| Category | Examples | Where to look |
|---|---|---|
| Clerical | Transcription, units, item swap, calculation, method code | Printouts, forms, the change history of your records |
| Method | Calibration bias, a reagent lot, a matrix outside the method’s scope | Calibration and lot records, your method group |
| Equipment | Pipette, balance, temperature, a fault or missed maintenance | Maintenance and check logs |
| Personnel | Reconstitution, technique, instructions not followed, training | Worksheets, training records |
| PT item | Damaged or warm on arrival, unstable, inhomogeneous | Receipt record, provider notices |
| Provider evaluation | A wrong assigned value or σpt, the wrong peer group, a keying slip | The report against the scheme plan and your submission |
The last two lie outside your laboratory, so they need outside evidence: a provider notice, a courier’s temperature log, a report that departs from the scheme plan. A bad score with good internal quality control is not that evidence.
Retesting retained material
A retest of the same material is one of the strongest checks you have. It separates a problem in your system, which would show again, from something that happened only on the day. It is sound evidence only when the material has not changed since the first test: stored as instructed, within its stated stability, not altered by opening, prepared the same way, and run with internal quality control. Retest before you change anything.
| Retest result | What it suggests | Look next at |
|---|---|---|
| Reproduces the error, same direction and size | A systematic cause in the system, or an error carried by the material itself | Calibration, method, equipment; what the retained portion shares with the original |
| Satisfactory | Something specific to the original day | The clerical trail, item identity, reconstitution, that run |
| Material doubtful: a storage lapse, or past its stability | Little either way | Other evidence; record the lapse |
The retest is evidence for your investigation. It never replaces the reported result.
Records for the test date
Pull the records for the day the item was tested and the days around it: internal quality control for that run and the trend before it; calibration, with the calibrator lot and the values entered; reagent lots and any lot-to-lot comparison; maintenance and service logs; the status of pipettes, balances and thermometers; who did the work and their training; and the worksheets and receipt record, with reconstitution time and volume, dilutions, run order and item condition.
Warning: internal QC in control does not clear the method
Internal quality control can miss a bias when its targets were reset from your own results after a lot change, when its concentration is far from the PT item’s, or when the control material behaves differently from the PT matrix.
Finding the root cause
The immediate cause is what went wrong on the day. The root cause is the deepest cause you can control whose removal stops it happening again. “Human error” is never a root cause on its own: ask why the process let the error through. Keep asking why until the answer is something a change to a process can fix.
Example: cadmium in river sediment, z = −3.6
- Why was the result low? Recovery from the digest was low.
- Why? One position in the digestion block ran about 15 °C under its set point.
- Why was that not noticed? Block temperatures were never checked between annual services.
- Why not? The block was not on the equipment check schedule.
- Why? Nothing in the installation procedure adds new equipment to the schedule.
Repairing the block is the correction. Changing the installation procedure removes the root cause.
When several causes are possible, draw a cause-and-effect (fishbone) diagram: the problem at the head, and a branch for each group of causes, such as method, equipment, materials, people, measurement, environment and reporting. List every candidate on its branch, then test each against the evidence. The diagram stops a team fixing on its first idea; it proves nothing by itself.
Does the suspected cause explain the score?
A cause is convincing when its size matches the error. Work out what the result would have been without it, then rescore.
Example: a dilution read the wrong way
Total phosphorus in effluent. The method dilutes one part sample with four parts water, a factor of 5, but the analyst multiplied by 4. Reported: 3.20 mg/L, against xpt = 4.10 mg/L and σpt = 0.25 mg/L, so z = (3.20 − 4.10) / 0.25 = −3.6.
Corrected: 3.20 × 5 / 4 = 4.00 mg/L, so z = (4.00 − 4.10) / 0.25 = −0.4. The corrected score is satisfactory and close to zero: the factor explains the whole error.
A cause can also explain only part of the error. A pipette found to deliver 3 % short would turn a result of 34.9 mg/kg into 36.0 mg/kg. Against xpt = 42.0 mg/kg and σpt = 2.1 mg/kg the score moves from −3.4 to −2.9: fix the pipette, but keep looking.
Correction and corrective action
A correction deals with the nonconformity you found. A corrective action removes its cause so it does not happen again. You usually need both.
| Root cause | Correction | Corrective action |
|---|---|---|
| A worksheet that lets a five-fold dilution be read as × 4 | Recalculate and record the right value | The worksheet calculates the factor; the notation is defined in the method |
| A pipette 4 % short, unchecked for two years | Take it out of service; repair or replace it | Put every pipette on the gravimetric check schedule |
| A unit typed by hand into the provider’s form | Note the right value in your file | A second-person check of value and unit before submission |
| A new digestion block never added to checks | Repair the block | The installation procedure adds new equipment to the schedule |
Then ask whether the same cause could be acting elsewhere: the same pipette on other methods, the same worksheet for other analytes, the same manual step on customer reports.
Impact on results already reported
A PT failure often exposes a problem that affected routine work too. Judge its significance, including its effect on results already released.
- Set the look-back window. It starts at the last point you can show the system was good, such as the last satisfactory equipment check, a reagent lot change or the last good PT round, and ends when the fix was in place.
- Size the error from the investigation: a five-fold dilution read as × 4 is −20 % on every diluted sample; a calibration bias may be a fixed percentage.
- Find the results that matter: those where the error could have changed a decision, such as a legal limit, a reference interval or a clinical action point.
- Act and record. Retest stored samples that are still stable, issue amended reports, and tell the customers or clinicians affected. Record the decision, and the reasons, even when no report needs changing.
Example: lead in drinking water, a −6 % bias
A true 10.0 µg/L reads 10.0 × 0.94 = 9.4 µg/L. So any result reported from 9.4 to 9.9 µg/L during the window could have been at or above a 10 µg/L limit. Those samples are retested where still available, reports amended where needed and the customers told. A positive bias works the other way: results just above a limit may really have been within it.
Checking that the fix worked
Decide before you act what evidence will show the action worked, and when you will look. The next PT round on its own is weak evidence. It is one result, at one level, often months away, and a problem that is still there may well score satisfactory anyway.
| Bias still present after the fix | Chance the next score is satisfactory |
|---|---|
| None | About 95 % |
| 1.0 σpt | About 84 % |
| 1.5 σpt | About 69 % |
| 2.0 σpt | About 50 % |
Direct evidence is stronger, and it should match the cause: a gravimetric check of the repaired or replacement pipette; a retest of retained PT material or a reference material, with internal quality control since the change; observed practice against the procedure; or an audit showing the new step is done. Use the following rounds as confirmation, not as the only proof.
Writing the record
Write the record so that someone who was not there can follow it and reach the same conclusion. A good record holds:
- the nonconformity: round, item, score, report reference;
- containment, and the risk judgement behind it;
- each check made, its result and where the evidence is filed;
- the root cause and how it was confirmed;
- the correction and the corrective action, with owners and dates;
- the impact assessment: window, results reviewed, decisions, notifications;
- the effectiveness criteria set in advance, and the evidence against each;
- who signed it off as closed, and when.
When the cause may be the item or the evaluation
Check every PT parcel when it arrives: packaging intact, temperature indicator, item codes against the dispatch note, leaks, cracks, labels, and the instructions. If anything casts doubt on an item, contact the provider before you test it, record the reply and follow it. Never adjust a result to allow for damage: report what you measured.
Providers make mistakes too: an assigned value from too few or mixed results, a σpt that is not the one in the scheme plan, a result scored in the wrong peer group. Check your own side first, gather what you submitted, what the report shows and the part of the scheme plan the evaluation departs from, and write to the provider through its complaints and appeals process, within any time limit it sets. Keep investigating meanwhile: the score stands until the provider changes it.
For the review that comes before any investigation, see how to read a PT report. For patterns across rounds that deserve the same treatment as a failed score, see PT trends and Youden plots.
Take the free lesson
Module 6 · Acting on results
Four lessons and a capstone case: starting an investigation, evidence and root cause, corrective action with impact and effectiveness, and sizing the response to the signal, including problems on receipt and suspected evaluation errors. The course is free in the EqasOnline Academy; lessons open after you create a free account.
Take the free lessonFollowing up poor scores across a scheme?
In EqasOnline an out-of-range result opens a corrective-action record that the provider’s reviewer accepts or returns, and complaints and appeals run in a thread that is closed with an outcome and a reason. Labs keep their results, reports, certificates and corrective actions for their ISO 15189 assessment.